Fiber optic loss budget calculator

Enter the fiber type, length, connections and splices. Get the expected loss at typical and TIA-568 maximum values, your power margin and the number to pass or fail an insertion-loss test.

FREE CALCULATOR

How the budget is built

A cable plant's loss budget is the sum of its parts: fiber attenuation times length, plus the loss of every connection (a mated pair of connectors) and every splice, plus anything else in the path such as a splitter. Compare it with your optics' power budget (transmitter output minus receiver sensitivity) to see how much margin is left, and with your test results after installation.

Values used

ComponentTypical (editable)TIA-568 maximum
Multimode fiber, 850 nm3.0 dB/km3.5 dB/km
Multimode fiber, 1300 nm1.0 dB/km1.5 dB/km
Singlemode fiber, 1310 / 1550 nm0.4 / 0.3 dB/km1.0 dB/km premises, 0.5 dB/km outside plant
Connection0.3 dB multimode; 0.2 dB singlemode (factory or fusion splice-on)0.75 dB
Splice0.3 dB multimode; 0.05 dB singlemode fusion0.3 dB

Typical values and the TIA-568 maximums as published in the Fiber Optic Association's free guide, Calculating Fiber Optic Loss Budgets. We don't reproduce the standard itself.

Worked example

A 0.2 km multimode link at 850 nm with 3 connections and 1 splice: fiber 0.2 × 3.0 = 0.6 dB, connections 3 × 0.3 = 0.9 dB, splice 0.3 dB, total 1.8 dB typical. At the TIA maximums it's 0.7 + 2.25 + 0.3 = 3.25 dB. With optics at −13 dBm out and −21 dBm sensitivity (an 8 dB power budget), the margin is 6.2 dB typical and 4.75 dB worst case, both above a 3 dB safety margin. At 1300 nm the same link is 1.4 dB typical and 2.85 dB at the maximums. These are the FOA guide's numbers and our automated tests.

Tips

  • Count connections, not connectors. Include both ends if you test with a one-cable reference, which is the most common method.
  • Fast multimode links (1G and up) lose part of their budget to dispersion, so the usable budget can be far smaller than the optics' specs suggest. Check your vendor's link-length table.
  • Your pass/fail number is the loss budget plus your test set's measurement uncertainty.

Planning the IP side too? Use the subnet calculator or the VLSM planner.

Sources

Formulas checked against the sources above and our automated test cases on 2026-10-18. Planning aid, not legal or engineering advice.